Binningen (BL), Holeerain 9, 11


- Location and concept: both three-apartment buildings are located on a quit side street, close to the Village Museum. Public transportation, shopping possibilities and schools are reachable in only few minutes within walking distance.

- Apartments: 2.5 Rooms; 3.5 Room, 4.5 Rooms and 5.5 Rooms.

- Construction standard: top quality construction; handicapped accessible with lift.

- Speciality: the construction costs were substantially increased due to the form of the plot, which is narrow and elongated with very little access to the street and has a sharp rise at the back.

- Responsibilities:
- Project planning: hwp Architekten AG
- Development: Arch-Ing Consulting AG
- Sale: Arch-Ing Consulting AG.